The drip edge is commonly installed at the juncture of the roof and wall. The metal flashing that prevents water from seeping into the house should be installed directly above the lower roof, as given below;

  1. Attach the eave drip edge to the sheathing using nails. This involves inserting the nail in the hole made by the screw and then driving it through the sheathing.
  2. Add an inch to either end of the drip edge. Place the second nail on the lower edge at a 45-degree angle to the first nail.
  3. Apply roofing felt. Roof felt provides additional protection by stopping leaks, water damage, and rotting of the fascia board. It also provides a good surface to which the drip edge can be fastened.
  4. Attach the rake drip edge to the felt. This is done by driving the nail head into the felt with a slightly overlapping drip edge.
  5. Place a nail every 12″ or fewer. This is the general rule, but if the surface is rough, use every 6″ or fewer to avoid snags.
  6. The rake’s drip edge overlaps the eave’s drip edge, in which the nails should parallel the long wood grain. Drip edges are generally placed on the wall’s sheathing, but some shed builders also prefer placing them into a foam board.
  7. Bend the corners of the eave drip edge beneath the rake edge. This helps prevent water migrations from one area of the roof to another.

What Fasteners Should You Use To Attach Galvanized Steel Drip Edge To A Roof?

A 1″ galvanized roofing nails or 3/4″ external screws are recommended. The fasteners should be roughly 12 inches apart.

See also  Why Do You Need Roof Battens?

Overlap two flashing pieces by at least 1-inch end to end, with the fasteners parallel to the long grain of the flashing.

Where Does The Drip Edge Go On A Roof?

A roof drip edge should be installed on top of the roof’s outer cover, immediately between the sheathing and the fascia board, forming a drainage gap between the drip edge and the fascia board.

Consequently, the drainage increases water flow while protecting the roof from water damage, thus protecting the fascia board from rotting and staining. It also helps decrease wind uplift and water penetration to help reduce wind and water damage.

What Is Drip Edge Flashing On A Roof?

A drip edge is a metal flashing inserted at the roof’s edges to direct water away from the fascia and preserve the underlying roofing components. It also helps shed water that may enter the house through the downspouts.

The purpose of a drip edge is to protect the fascia board, weather-stripping, and other house components from water seepage. It is installed at the base of a roof’s exterior wall.

Is The Drip Edge Nailed To The Roof?

The drip edge is attached to the fascia board below by nailing into the roof decking at the border of your roof. This adds added support to the deck boards and fascia, preventing movement.

The nails should be offset from the fascia to allow for drainage, though the drip edge will not carry water loads. It is also recommended that nails not be placed over any beams or girders as this may cause leaks.

See also  How Do You Clean Moss Off A Slate Roof?

How Do You Measure A Roof For A Drip Edge?

Drip-edge metal is only used near the gutters on the bottom edge of roofs. To determine how much drip edge you require, measure the length and add 10%. It is common for the metal to be measured in feet; adding this 10% is easier than trying to add 10% of the total roof length.

For instance, an average roof and gutter would require 6 feet of drip edge. To figure out how much metal you need: 6′ x 1.10 (addition of 10%) = 6.6′ or 6 feet and 6 inches