How Many Bags Of Cement Do I Need For A 3-Bedroom House In Kenya?

Cement is the most essential component when building a house in Kenya. It is necessary to have enough cement to build the foundation, walls, roof, and any other features of the house.

How many cement bags are needed to construct a three-bedroom house in Kenya?

In Kenya, standard 3-bedroom bungalow houses typically use between 180-280 bags of cement from the foundation to the finishes. The number of cement bags you need for a 3 bedroom house will however vary depending on the size of the house and the specific construction techniques used.

In general, for foundations and machine-cut stone walling, a typical homeowner might need up to 120 bags. Other areas include plastering about 50 bags, flooring 30 bags, and external finishes 20 bags.

So, if your house is, say, 100 square meters, you would need 240-260 bags of cement. Obviously, this quantity will vary depending on the type of foundation being used and the thickness of the walls.

The amount of cement needed depends on a number of factors, including the size and shape of the house, the quality of the cement, and the skill of the contractor.

However, in general, a three-bedroom house in Kenya typically requires between 180 and 280 bags of cement.

Note that is important to consult with a professional to calculate the amount of cement needed for a project to avoid wastage.

Other Construction Costs for a 3 Bedroom House In Kenya

The cost of building a three-bedroom house in Kenya varies depending on the materials used and the size of the house.

However, the average cost of building a three-bedroom house in Kenya is about KES. 1,500,000 -3,000,000.

The other materials and costs include;

  • Foundation Stones =60,000
  • River Sand =132,000
  • Ballast =60,000
  • Hardcore 15,000
  • Cement 240 bags =168,000
  • Gladiator (termite killer) =3500
  • DPM = 12000
  • DPC =12000
  • BRC Mesh = 33,000
  • Machine cut stones 2800 stones =100,000
  • Roof material (MRM Versatile) 78pcs =220,000
  • Roof & Ordinary Nails = 6,000
  • Y10 = 13,000, R8 = 16,000, Y12 15,000
  • Binding wire 10kgs =3,000
  • Timber and fascia =180,000
  • Kitchen Boards and sinks =50,000
  • Wardrobe boards = 50,000
  • Tiles(30 by 30) 80 Boxes = 70,000
  • (60 by 60) 23 Boxes = 33,000
  • Bathroom tiles 14 Boxes = 20,000
  • Gypsum ceiling installation = 120,000
  • Doors = 50,000, Windows =75,000
  • Paintwork =110, 000
  • Round poles = 6,000
  • Electric materials = 65,000
  • Wall pass 3 rolls = 9,000
  • All plumbing materials =55,000
  • Labour and logistics 400,000
  • Miscellaneous = 40,000

The estimated Total Construction Cost is KES. 2,195,000.

Get Instant Cost Estimates Below (Calculator)

How To Use The Construction Cost Calculator

Step 1:  Adjust the Plinth Area to the estimated Total Area of your upcoming house. E.g, 2 Bedroom = 60 Square Metres, 3 Bedroom from 80 Square Metres, etc…

Step 2 : Choose the Type of Finishing, Roofing Type, and Flooring TypeApproximate project cost will be indicated below this. 

Step 3:  You can also include contact details and submit

Instant Calculator

KSh0.00

Approximate Project Cost

We are contacting you as soon as this Cost Estimate is received.

Related Posts

error: Content is protected !!
0

Compare